The short answer

The number of SDRs you need depends on peak leads per hour, the time each lead takes to handle and the reply time you want. Convert leads and handling time to workload in erlangs, then use the Erlang C formula to find the smallest team that meets your service level.

Key takeaways
  • Size for peak hours, not daily averages.
  • Workload is leads per hour times handling time in hours.
  • A team only slightly above the workload still queues.

Compute the workload

If 60 leads arrive each hour and each takes 5 minutes, the workload is 60 × 5 ÷ 60 = 5 erlangs. A team of 5 would be fully busy with no slack, so waits would grow at busy times.

Apply Erlang C

Erlang C estimates the chance that a new lead must wait and how long. For 5 erlangs and a target of 80% answered within 5 minutes, you need 7 reps. The service level at 7 reps is about 96%.

Reduce the load

Shorter handling time, automated first replies and lead routing all lower the workload. Each minute saved per lead reduces the team size you need.

Free tool / Telecom queueing

How many SDRs to reply within 5 minutes?

Lead Response Capacity

Questions about Unit Economics and Measurement

Is five minutes the right target?

Many teams see the best contact rates within the first five minutes, though results vary.

Do I need to staff for the busiest hour?

Staff close to peak demand or use overflow coverage for spikes.