- Size for peak hours, not daily averages.
- Workload is leads per hour times handling time in hours.
- A team only slightly above the workload still queues.
Compute the workload
If 60 leads arrive each hour and each takes 5 minutes, the workload is 60 × 5 ÷ 60 = 5 erlangs. A team of 5 would be fully busy with no slack, so waits would grow at busy times.
Apply Erlang C
Erlang C estimates the chance that a new lead must wait and how long. For 5 erlangs and a target of 80% answered within 5 minutes, you need 7 reps. The service level at 7 reps is about 96%.
Reduce the load
Shorter handling time, automated first replies and lead routing all lower the workload. Each minute saved per lead reduces the team size you need.
How many SDRs to reply within 5 minutes?
Questions about Unit Economics and Measurement
Is five minutes the right target?
Many teams see the best contact rates within the first five minutes, though results vary.
Do I need to staff for the busiest hour?
Staff close to peak demand or use overflow coverage for spikes.
Key terms
Keep reading